Here is a look at the Highway 4 Traffic Schedule for the week of October 26. There will be a full freeway closure in the eastbound direction of Highway 4 between SR160 connector ramp and Laurel Road Sunday from 11:59pm to 5:00 am.
FULL FREEWAY CLOSURES:
EASTBOUND:
All lanes of SR4 in the eastbound direction will be closed between the SR160 connector ramp and Laurel Road on Sunday evening from 11:59 pm to 5:00am.
WESTBOUND:
There are no westbound full freeway closures planned for this week.
HIGHWAY LANE CLOSURES:
There are no highway lane closures planned for this week.
RAMP CLOSURES:
There are no ramp closures planned for this week.
LOCAL STREET CLOSURES:
Southbound Lone Tree Way/A Street will be closed between the SR4 eastbound on ramp and the SR4 westbound off ramp on Sunday through Saturday evening from 10:00 pm to 5:00 am.
