Here is a look at this weeks construction schedule for Highway 4 which will include lane closures, ramp closures and local street closures.
FULL FREEWAY CLOSURES:
There are no full freeway closures planned for this week.
HIGHWAY LANE CLOSURES:
State Route 4:
There will be highway lane closures in the eastbound direction of State Route 4 between the State Route 4/State Route 160 connector ramp and Laurel Road on Friday evening from 8:00 pm to 10:00 am.
There will be highway lane closures in the westbound direction of State Route 4 between Laurel Road and the State Route 4/State Route 160 connector ramp on Thursday evening from 4:00 pm to 8:00 am.
There will be highway lane closures in the westbound direction of State Route 4 between Lone Tree Way and Sand Creek Road on Tuesday from 9:00 am to 3:00 pm.
State Route 160:
There will be highway lane closures in the northbound direction of State Route 160 between the State Route 4/State Route 160 connector ramp and Main Street on Monday from 7:00 am to 4:00 pm.
RAMP CLOSURES:
There will be single lane closures on the State Route 4 eastbound on and off ramps at Somersville Road on Sunday through Friday evenings from 11:00 pm to 6:00 am.
LOCAL STREET CLOSURES:
There will be single lane closures in the westbound direction of Balfour Road between Summerset Drive and State Route 4 on Thursday from 8:30 am to 2:30 pm.
Click here for a full PDF version of planned lane closures for this week.
