2.5K
On Saturday around 2:30 pm, the CHP issued a SIGALERT after the Isleton Bridge was closed in both directions due to mechanical issues on CA-160. Motorists are advised to expect delays and use alternative routes.
CALTRANS confirmed the closure.
The estimated time to reopen the roadway is Monday, November 26th, at 12:00 PM.
UPDATE
As of 6:00 pm Saturday, the Bridge was open.
| Detail Information | |||||||
| 2:31 PM | 7 | [20] UPDATE SIGALERT – SR 160 IS CLOSED AT THE ISLETON BRIDGE JNO THE TOWN OF ISLETON DUE TO BRIDGE REPAIRS. THE ESTIMATED TIME OF OPENING IS 11/26/18 @ 1200 | |||||
| 1:55 PM | 6 | [12] UPDATE SIGALERT – SR 160 IS CLOSED AT THE ISLETON BRIDGE JNO THE TOWN OF ISLETON DUE TO BRIDGE REPAIRS. THE ESTIMATED TIME OF OPENING IS 11/26/18 @ 0800 | |||||
| 1:53 PM | 5 | [11] [Notification] [CHP]-THE NEW ETO FOR ISLETON BRIDGE IS 11/26/18 @ 0800 | |||||
| 1:46 PM | 4 | [9] ISSUE SIGALERT – SR 160 IS CLOSED AT THE ISLETON BRIDGE JNO THE TOWN OF ISLETON DUE TO BRIDGE REPAIRS, THE ESTIMATED TIME OF OPENING IS APPROX 1400 | |||||
| 1:43 PM | 3 | [5] [Notification] [CHP]-THE BRIDGE ETO IS APPROX 1400 | |||||
| 1:38 PM | 2 | [2] 112-L1 GEORGIANA SLOUGH BRIDGE NOW OPEN TRFC FLOWING | |||||
| 1:38 PM | 1 | [1] 112-L1 ISLETON BRIDGE APPEARS TO BE STILL CLOSED / GET ETO FRM CT GEORGIANA SLOUGH BRIDGE / PINS HAVING ISSUE BEING RESET / TRFC BACKED UP 3 MILES | |||||
