Home Contra Costa CountySept 26-30: Highway 4 Construction Schedule

Sept 26-30: Highway 4 Construction Schedule

by ECT

Here is a look at the road work scheduled for Highway 4 between September 26-30 which will see several Highway 4 lane and local street closures.

FULL FREEWAY CLOSURES:

There are no full freeway closures of State Route 4 planned for this week.

HIGHWAY LANE CLOSURES:

There will be highway lane closures in the eastbound direction of State Route 4 between Bailey Road and L Street / Contra Loma Boulevard on Monday through Friday from 4:30 am to 12:00 pm.

There will be highway lane closures in the westbound direction of State Route 4 between Railroad Avenue and L Street / Contra Loma Boulevard on Monday through Friday from 11:00 am to 7:00 pm.

There will be highway lane closures in the eastbound direction of State Route 4 between L Street/ Contra Loma Boulevard and the State Route 4 / State Route 160 connector ramp on Monday through Friday from 9:00 pm to 12:00 pm (noon).

There will be highway lane closures in the eastbound direction of State Route 4 between L Street / Contra Loma Boulevard and the State Route 4 / State Route 160 connector ramp on Monday through Friday from 9:00 am to 5:00 am.

There will be highway lane closures in the westbound direction of State Route 4 between Hillcrest Avenue and A Street / Lone Tree Way starting on Friday (9/23/2016) evening at 8:00 pm and ending on Saturday morning at 7:00 am.

There will be highway lane closures in the eastbound direction of State Route 4 between G Street and Hillcrest Avenue starting on Friday (9/23/2016) evening at 9:00 pm and ending on Saturday morning at 10:00 am.

There will be highway lane closures in the westbound direction of State Route 4 between the State Route 4 / State Route 160 connector ramp and Hillcrest Avenue on Saturday evening from 7:00 pm to 10:00 am.

There will be highway lane closures in the eastbound direction of State Route 4 between Hillcrest Avenue and the State Route 4/ State Route 160 connector ramp on Saturday evening from 9:00 pm to 9:00am.

LOCAL STREET CLOSURES:

There will be lane closures in the northbound and southbound directions of Hillcrest Avenue between Larkspur Drive and Sunset Drive on Saturday through Friday from 9:00 am to 3:00 pm.

There will be lane closures in the northbound and southbound directions of A Street / Lone Tree Way between Rossi Avenue and E. Tregallas Road on Saturday through Friday from 9:00 am to 3:00 pm.

Click here for a full PDF version of the planned lane closures for this week.

 

 

 

 

You may also like