Here is a look at the road work scheduled for Highway 4 between October 10-14 which will see several Highway 4 lane and ramp closures at Hillcrest mid-week.
FULL FREEWAY CLOSURES:
There are no full freeway closures of State Route 4 planned for this week.
HIGHWAY LANE CLOSURES:
There will be highway lane closures in the eastbound direction of State Route 4 between Bailey Road and L Street / Contra Loma Boulevard on Tuesday through Friday from 4:30 am to 12:00 pm.
There will be highway lane closures in the westbound direction of State Route 4 between Railroad Avenue and L Street / Contra Loma Boulevard on Tuesday through Friday from 11:00 am to 7:00 pm.
There will be highway lane closures in the eastbound direction of State Route 4 between L Street/ Contra Loma Boulevard and the State Route 4 / State Route 160 connector ramp on Tuesday through Friday from 9:00 pm to 12:00 pm (noon).
There will be highway lane closures in the westbound direction of State Route 4 between L Street / Contra Loma Boulevard and the State Route 4 / State Route 160 connector ramp on Tuesday through Friday from 9:00 am to 5:00 am.
RAMP CLOSURES:
There will be lane closures on the State Route 4 eastbound on and off ramps at A Street/ Lone Tree Way on Tuesday through Friday from 9:00 pm to 12:00 pm (noon).
LOCAL STREET CLOSURES:
There will be lane closures in the northbound and southbound directions of Hillcrest Avenue between Larkspur Drive and Sunset Drive on Monday through Friday from 9:00 am to 3:00 pm.
Click here for a full PDF version of the planned lane closures for this week.
