Here is a look at the road work scheduled for Highway 4 between July 4-8 which will see lane, ramp and local street closures.
FULL FREEWAY CLOSURES:
There are no full freeway closures of State Route 4 planned for this week.
HIGHWAY LANE CLOSURES:
There will be highway lane closures in the westbound direction of State Route 4 between Somersville Road / Auto Center Drive and Railroad Ave. Monday through Friday from 11:00 am to 7:00 pm.
There will be highway lane closures in the eastbound direction of State Route 4 between Bailey Road and the State Route 4 / State Route 160 connector ramp on Monday through Friday from 4:30 am to 12:00 pm.
There will be highway lane closures in the eastbound direction of State Route 4 between A Street / Lone Tree Way and the State Route 4 / State Route 160 connector ramp on Saturday from 7:00 am to 11:00 am.
There will be highway lane closures in the westbound direction of State Route 4 between A Street / Lone Tree Way and the State Route 4 / State Route 160 connector ramp on Saturday from 10:00 am to 3:00 pm.
RAMP CLOSURES:
There are no ramp closures of State Route 4 planned for this week.
LOCAL STREET CLOSURES:
There will be lane closures in the eastbound and westbound directions of Larkspur Drive between Hillcrest Avenue and Wildflower Drive on Saturday through Friday from 9:00 am to 3:00 pm and 7:00 pm to 6:00 am.
There will be lane closures in the northbound and southbound directions of Hillcrest Avenue between Larkspur Drive and Sunset Drive on Saturday through Friday from 9:00 am to 3:00 pm and 7:00 pm to 6:00 am.
There will be lane closures in the northbound and southbound directions of A Street/Lone Tree Way between Rossi Avenue and E. Tregallas Road on Saturday through Friday from 9:00 am to 3:00 pm and 7:00 pm to 6:00 am.
There will be lane closures in the northbound and southbound directions of Somersville Road / Auto Center Drive between Delta Fair Boulevard and Century Boulevard on Saturday through Friday from 9:00 am to 3:00 pm.
Click here for a full PDF version of the planned lane closures for this week.
