Home Contra Costa CountyAugust 15 – 19: Highway 4 Construction Schedule

August 15 – 19: Highway 4 Construction Schedule

by ECT

Here is a look at the road work scheduled for Highway 4 between August 15-19 which will see lane  local street closures.

FULL FREEWAY CLOSURES:

There are no full freeway closures of State Route 4 planned for this week.

HIGHWAY LANE CLOSURES:

There will be highway lane closures in the eastbound direction of State Route 4 between Bailey Road and L Street / Contra Loma Boulevard on Monday through Friday from 4:30 am to 12:00pm.

There will be highway lane closures in the westbound direction of State Route 4 between Railroad Avenue and L Street / Contra Loma Boulevard on Monday through Friday from 11:00 am to 7:00 pm.

There will be highway lane closures in the eastbound direction of State Route 4 between L Street/ Contra Loma Boulevard and the State Route 4 / State Route 160 connector ramp on Monday through Friday from 9:00 pm to 12:00 pm (noon).

There will be highway lane closures in the westbound direction of State Route 4 between L Street / Contra Loma Boulevard and the State Route 4 / State Route 160 connector ramp on Monday through Friday from 11:00 am to 5:00 am.

RAMP CLOSURES:

There are no ramp closures of State Route 4 planned for this week.

LOCAL STREET CLOSURES:

There will be lane closures in the northbound and southbound directions of Hillcrest Avenue between Larkspur Drive and Sunset Drive on Saturday through Friday from 9:00 am to 3:00 pm.

There will be lane closures in the northbound and southbound directions of A Street / Lone Tree Way between Rossi Avenue and E. Tregallas Road on Saturday through Friday from 9:00 am to 3:00 pm.

Click here for a PDF version of planned lane closure for this week.

You may also like